86 Intermediate Superheater Assemblies

Minnesota

A 55 megawatt renewable energy power plant needed to replace 86 intermediate super heater assemblies.

The boiler at the facility is a Foster Wheeler design that went into operation approximately 2007. The boiler is a natural circulation, superheated, balanced draft design, single furnace, stoker fired unit firing biomass, including poultry litter. The boiler is rated to produce steam for a steam turbine generator rated approximately 55 MW. The boiler produces 490,000 pph of steam at 1,555 psig and 980 °F.

The Superheater
Scope of Work
  • Field Inspection
  • Engineering (Installation/arrangement and shop fabrication drawings)
  • Material procurement
  • Fabricate 86 intermediate superheater pendants complete with 360 degree Inconel weld overlay in lieu of tube shields, S.S. hand-cuff tube supports, and all solid ties.
  • HB Field Services performed the demo and installation on the new elements.

39 Merrimack Street, Lawrence, Massachusetts, 01843 | (978) 683-7244info@helfrichbrothers.com

CONTACT US
Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from Youtube
Vimeo
Consent to display content from Vimeo
Google Maps
Consent to display content from Google